How to Choose Between LOD 200 and LOD 500
Match your level of development to project requirements. Understanding the trade-offs between detail, time, and cost ensures you deliver exactly what stakeholders need.
LOD 200
Schematic Design
Tolerance50-100mm
Delivery24-48 hours
Cost$
Early design, feasibility studies
Basic geometric shapes
Approximate dimensions
General spatial relationships
Detailed connections
Manufacturer-specific data
LOD 300
Design Development
Tolerance25-50mm
Delivery3-5 days
Cost$$
Coordination, clash detection
Accurate geometry and dimensions
Object classifications
Basic material assignments
Fabrication details
Shop drawing accuracy
LOD 400
Construction Documents
Tolerance10-25mm
Delivery1-2 weeks
Cost$$$
Fabrication, installation
Fabrication-level detail
Connection specifications
Installation sequences
As-built conditions
Field verification
LOD 500
As-Built / Record
Tolerance5-10mm
Delivery2-4 weeks
Cost$$$$
Facility management, renovation
Field-verified geometry
Complete as-built conditions
Maintenance schedules